Plate size - 650 x 1000 mm, weight - 630 kg.
Materials:
- Ordinary brick - 175 pc.
- A solution of clay - 40 l;
- Furnace door is 250 x 205 mm - 1 piece.
- The clean door 140 x 140 mm - 1 piece.
- The ash-pit door 140 x 140 mm - 1 piece.
- Smoke damper 130 x 130 mm - 1 piece.
- Cast iron plates 530 x 120 mm - 1 piece.
- Cast iron stove with two 530 x 360 mm - 1 piece.
- Brass cabinet 350 x 350 x 450 mm - 1 piece.
- Sheet steel (under the plate) - 640 x 1020 mm;
- Grill grate 250 x 250 mm - 1 piece.
- Felt the building - 1 kg;
- Corner of steel 30 x 40 x 4 mm - 8 pc.
- Steel strips 25 x 15 mm - 2 m
Masonry is on the floor, which is pre-coated with a double layer of felt impregnated with clay mortar, and close the top roofing steel.
1st row - out whole bricks, at least outside the ranks of the lay of the whole, and the middle of the half-brick.

2nd row - spread only whole bricks. Required bandaging joints.
Third row - make out the ash-pit hole, set the door of cleaning, which is placed in the 2nd row.
4th row - in the back of this series should be left to the hole for fixing pipe connecting the stove to the chimney. Begin to lay out a channel for the passage of the hot flue gases to the chimney opening. To do this, put a brick on edge at a distance of 13 cm from the masonry. This brick wall forms a channel. In this series, the ash-pit lay the hole, set the door. Blower size - 26 x 26 cm brick at the inlet to mow.
5th row - overlaps door cleaning. The partition does not continue as a brick, placed on the edge, is a two-series high.
6th row - first set oven. She put on a thin layer of clay mortar. Between the oven and the wall panels are placed upright bricks to form two channels. Brick has a height of four courses of masonry. Reduce the ash pit to the size 13 x 26 cm
7th row - laying grate. On both sides of the bricks framing abate angle for fuel. To protect the oven from the firebox from the effects of high temperatures close to the Spirits of the box put a brick on edge, securing it on a clay solution. Installing the firebox door over the series.
8th row - the formation of the fire size 26 x 52 cm
9th row - is placed in the same way as the previous one.
10th row - the channel is blocked by the back wall of the oven is left on the side of the channel. This operation is performed by a full-brick and trehchetvertok. For more free pass flue edge walls give a rounded shape of the combustion chamber. Partition between the oven and the firebox erected about 15 cm above the oven.
11th row - Set the iron plate. Overlap the firebox doors and oven. Oven covered with a layer of clay mortar thickness of 1.5 cm between the oven and the cast-iron stove should be a minimum distance of 7 cm
12th row - with two cast-iron plates laying on a thin layer of clay mortar. One of the burners are placed directly above the firebox.